From:                              route@monster.com

Sent:                               Thursday, April 07, 2016 12:01 PM

To:                                   hg@apeironinc.com

Subject:                          Please review this candidate for: p6 Scheduler

 

This resume has been forwarded to you at the request of Monster User xapeix03

Rodney J. Lingo 

Last updated:  11/23/15

Job Title:  no specified

Company:  no specified

Rating:  Not Rated

Screening score:  no specified

Status:  Resume Received


Holtwood, PA  17532
US

Home: 717-284-3276   
Work:
734-384-2402
rodneylingo@yahoo.com
Contact Preference:  Email

Quick View Links:

Resume Section

Summary Section

 

 

RESUME

  

Resume Headline: Planner/Scheduler/Instructor

Resume Value: igqrfi8x8xkunifg   

  

 

RODNEY J. LINGO

24 Bethesda Church Road, E.
Holtwood, PA 17532
(717) 284-3276 • slingo3160@aol.com


OBJECTIVE

A Nuclear Maintenance Planner/Scheduler, Instructor, Supervisor or related position where I will utilize my knowledge of power/energy supply industry and Manufacturing to plan, lead or train others in maintaining equipment safely and cost-effectively on time and under budget.

EXPERIENCE
 

DZ INC.                                                                                                 Contractor          2013 to 2015

Construction Engineer/ Lead Planner on projects for:

Cyber Security, Inspections, Walkdowns, Assessments and CDA Scoping according to NEI guidelines.  


Shaw Stone and Webster                                                                     Contractor         2009 to 2015

Nuclear Maintenance Construction and Mod Planner, Co-Ordinator (supervisory)

Responsible for developing maintenance work documents, administrative controls, specific work instructions, and post-maintenance test requirements providing instructions to technicians to ensure safe and efficient operation of the unit, performance of troubleshooting activities and corrective maintenance in accordance with UFSAR, technical specifications, and vendor recommendations. Also responsible for preparing and updating work packages to resolve condition reports, routine activities, reported deficiencies, or enhancements to ensure completion within the established deadlines and schedules. Plan Fiber Optic backbone, MUR Projects, MSO and Fukishema Upgrade Projects.

Develop work order tasks for support groups, and Post Maintenance Testing (PMT) testing and provides work instructions, identifying man-hours for the craft corrective and preventative maintenance work packages to meet the "Online" and "Outage" scheduling requirements for the maintenance department. Plan Major Power Upgrades and Modifications based on the scheduling needs. Review and identifies changes to Engineering Change Reports, to support work order planning instructions. Prepare and/or submit door impairments, fire impairments, clearance, scaffold, and temporary power requests. Verify work instructions are adequate and comply with all applicable station procedures. Maintain plant configuration control for parts replacements in accordance with nuclear guidelines.

 

Pennsylvania Power and Light Co.                                                                                2007-2009
Maintenance FSH Planning Supervisor and Electrical/I&C/Mechanical Supervisor
Responsible for the leadership of planners and technicians of various disciplines at Fossil, Hydro and Cogeneration plants in the planning and work execution for maintenance and modifications in accordance with their specific site procedures. Qualifications include working knowledge of electrical code requirements, knowledge of pneumatic/electronic, instrumentation, process controls, Power distribution and breakers. Pumps, heat exchangers, fans, etc. Also the Creation of PM's, CM's and modifications on equipment at nuclear power plants. Interacted with engineering, operations, schedulers, health physics, Chemistry, craft supervisors, contractors, and parts facilities. At times perform cross discipline planning in Mechanical/HVAC. Interpret Engineering documentation and calculations. Utilize multi tasking skills to manage multiple assignments. Interpret details of plant drawing and prints. Perform on-call planning coverage and work extended hours to support plant outages and unplanned outages and ability to work independently. Work performed at Susquehanna nuclear power plant, Brunners Island and Montour power plants.
 

ABB INC.                                                                                                                        2007

Field Service Engineer/ Project Manager/ Field Services Supervisor

Responsible for overall management and planning for work groups associated with performing all breaker repairs, overhauls and breaker upgrades of equipment from 220 volt to 750kv at various substations and power plants throughout the world. Travel extensively throughout the U.S. to power plants such as: Vermont Yankee, Turkey Point, Kewanee, Point Beach, Monroe, Fermi, Susquehanna, Fort St. Vrain, Brunswick, Robinson, Wind energy and Fossil/Hydro plants.  


 

DTE Energy, Detroit, Mi                                                                                                  2005-2007
Maintenance Work Management Specialist: (supervisory)
Responsible for the planning/scheduling and coordination of up to 50 electrical and instrument and control, Corrective & PM work packages weekly and up to 3 engineering design modifications monthly to maintain electrical, instrument & control equipment at nuclear power plants, while maintaining schedules and budget. Supervised maintenance Instrument/Electrical team during outages or as conditions permitted. Interacted with various work groups such as: engineering, operations, schedulers, craft supervisors, contractors, and parts facilities to determine man-hours and parts needed, scheduling estimates; ordered parts ranging from $ 2 to $75,000 each. Provided direction, guidance, and mentoring to maintenance technicians within the craft-specific discipline.

Cybercoders, Irving, CA.                                                                                          Contractor 6 months
Maintenance Reliability Planner/Scheduler (supervisory):
Planned up to 80 Electrical/Instrument & Mechanical Corrective and PM work packages weekly and up to 3 engineering design modifications monthly to maintain equipment at a large U.S. chemical factory, while maintaining schedules and budget. Interacted with engineering, operation, operation schedulers, craft supervisors, contractors, and parts facilities to determine man-hours and parts needed, scheduling estimates; ordered parts ranging from $ 2 to $15,000 each. Project manager on large specialty jobs. Provided direction, guidance, and mentoring to mechanical maintenance, electrical and I&C technicians within the craft-specific discipline. Assigned work to craftsman on daily and project basis as needed. Gathered information, developed agenda, and chaired monthly Maintenance Reliability Group meetings. Assigned Leadership of Maintenance Team when superintendent was off for vacations, sick, etc.

Peco Energy Co. Philadelphia, PA                                                                                         15+ years
Lead Maintenance Nuclear Planner/Scheduler/Coordinator (supervisory):
In this role, I planned, scheduled and analyzed schedules to minimize duration and risk, while making best use of resources and the equipment. Maintained, assisted in development, and distributed computerized schedules for daily, refueling, mid-cycle, forced outages and other work at a large nuclear power plant. I provided project coordination and planning for development and implementation for daily/outage specific tasks such as: Electrical Busses, breakers, relays, power supplies, instrumentation, motor operated valves, etc. This included technical understanding of the related issues and demonstrating the capability to communicate effectively orally and in writing about these projects. Evaluated and prioritized corrective and preventive maintenance activities and design change modifications to assist in daily and outage planning and scope control. Ensured planning and schedule development embodied consideration for plant equipment safety as well as personnel safety. Identified, negotiated and recommended effective contingency plans to support achievement of daily/outage goals and milestones. Held meetings and reviewed weekly and post outage critiques and recommended corrective actions and improvements for future work.
Coordinated daily and outage schedules to return the unit to service. Exhibited effective project management skills and demonstrated capability to perform various methods of analysis.
Planned up to 35 electrical & instrument, corrective and Pm work packages weekly and up to 3 engineering design modifications monthly using PIMS, CHAMPS and Passport software to maintain Electrical/I&C equipment at nuclear power plant and substations, while maintaining schedules and budget. Interacted with engineering, operations, schedulers, craft supervisors, contractors, and parts facilities to determine man-hours and parts needed, scheduling estimates; ordered parts ranging from $ 2 to $750,000 each. Provided direction, guidance, and mentoring to maintenance Electrical/I&C technician planners within the craft-specific discipline. Assigned work to planners on daily and project basis as needed. Gathered information, developed agenda, and chaired monthly Maintenance Planning Group (Planning, FIN, Programs). Replaced Manager 2000 hours while he attended institute of nuclear power operation. Saved $50,000+ by effective use of manpower. Assigned Lead Planner of FIN (Fix-It-Now) Team which became model in nuclear industry using streamlined process to identify, schedule, and repair problems.
• Received Hi-Energy Award three consecutive years.
• Saved $5MM daily over 7-day period by advance troubleshooting, keeping reactor online and identifying repair online.
• Given award for lowering maintenance backlog from 10,000 work requests to less than 1000 in one year.
• Considered Subject Matter Expert (SME)/Electrical on site.
• Recognized for surpassing safety goals.


EQUIPMENT/TOOLS
Motors, generators, mg-sets, controls, switches, breakers, multi-amp testers, oscillographs, high/low voltage equipment/testers, analyzers, man-lifts, cable trucks, winch trucks, bucket trucks, Splicing trucks and equipment, FERC qualified.

COMPUTER SKILLS
PCs, Excel, Word, Numerous Maintenance CMMS programs, Plant Information Maintenance Management Systems (P.I.M.S.), INDMNS, C.R.L., B.O.M., Passport (numerous), PIMS, Empac, Impecho, Maximo, S.A.P., ESOMS, NIMS, SAP, Outlook, Access, PowerPoint, Synergis, P3 Primavera, Citrix, Lotus Notes, MSOffice, M.S. Project, Plant View, PASTA, Maximo, GpMate, Documentum, Computerized History Maintenance Planning System (CHAMPS), Primavera P5, P6 and Adabas, Lumension.

EDUCATION/CERTIFICATIONS

Company-sponsored Training: Effective Communication, How to Lead Others With Tact & Skill, Public Speaking, Conflict Management, PIMS, CMMS, Excel, Lotus, Word, CHAMPS, MAXIMO, EMPAC, Passport, Schematics, Procedures, Cable Splicing, Metering, Machinist, Tools and Their Uses (Philadelphia Electric Company, Philadelphia, PA)

Cyber Security Training for Assessors, Constellation Energy Co.
Management Training School, PPL LLC. Allentown, Pa.
Primavera 6.0 Training at Montour Power Plant for PPL LLC.
Primavera 5.0 Training at New Horizons Detroit, Mi for DTE Energy Co.
Planner Training, PPL, Walbert Training Center, Allentown, Pa
Maintenance Planner Certificate (160 hours), Philadelphia Electric Company (PECO)
Mini Supervisory Development Academy, PECO Energy Co.

Lead Maintenance Planner Certificate (90 hrs), PECO

Lead Maintenance Technician Certificate, PECO
Electrical Engineering Electronics, Harrisburg Area Community College
Systems Engineering (160 hours), PECO
First Class Electrician, PECO
Electrical Engineering Training (3.5 yrs), PECO Training Center, Norristown/Philadelphia, Pa.
Diploma, Abraham Lincoln High School, Philadelphia, PA



Experience

BACK TO TOP

 

Job Title

Company

Experience

Lead Planner Schduler

Day and Zimmerman

8/1985 - 4/2004

Lead Maintenance Planner/Scheduler

Day & Zimmermann, Inc.

2/1989 - 4/2004

 

Education

BACK TO TOP

 

School

Degree

Major

philadelphia electric com.

Vocational

Philadelphia Electric Company

Certification

Philadelphia Electric Company

Vocational

Harrisburg Area Community College

Some College Coursework Completed

peco-energy

Some College Coursework Completed

 

Skills

BACK TO TOP

 

 

Last Used

Experience

Breaker Calibration

Currently used

20 years

2.4kv,4,13kv, 220-500kv Breaker Overhauls

Currently used

15 years

PCs,

Currently used

10 years

Excel, Word,Passport

Currently used

7 years

CMMS, CHAMPS, PIMS, INDEMS

Currently used

15 years

Passport

Currently used

5 years

Planning

Currently used

20 years

Supervisor

Currently used

20 years

Citrus

Currently used

1 years

 

Additional Info

BACK TO TOP

 

Desired Salary/Wage:

80,000.00 - 140,000.00 USD yr

Current Career Level:

Experienced (Non-Manager)

Years of relevant work experience:

More than 15 Years

Date of Availability:

Within 2 weeks

Work Status:

US - I am authorized to work in this country for any employer.

Active Security Clearance:

Active Confidential

US Military Service:

Citizenship:

US citizen

 

 

Target Job:

Target Job Title:

Maintenance Planner/Scheduler

Alternate Target Job Title:

Supervisor/Trainer

Desired Job Type:

Employee
Temporary/Contract/Project

Desired Status:

Full-Time
Per Diem

Willing to work the following shifts:

First Shift (day)
Second Shift (afternoon)
Third Shift (night)

Willing to work weekends:

Yes

 

Target Company:

Company Size:

No Preference

Industry:

Metals and Minerals
Energy and Utilities
Construction - Industrial Facilities and Infrastructure
Aerospace and Defense
Manufacturing - Other
Government and Military
Construction - Residential & Commercial/Office

Occupation:

Engineering

·         Aeronautic/Avionic Engineering

·         Energy/Nuclear Engineering

 

Target Locations:

Selected Locations:

US

Relocate:

Yes

Willingness to travel:

Up to 50% travel

 

Languages:

Languages

Proficiency Level

English

Fluent

Spanish

Intermediate